Report an interim inspection of pressure equipment (PE)
No later than 30 days after an interim inspection of pressure equipment (PE), the entity (body) must inform the Portuguese Quality Institute (IPQ) that the inspection has been carried out. The IPQ will then check whether the PE is still safe for use.
The notification must be submitted no later than 30 days after the inspection has been carried out.
The notification is submitted online and is free of charge.
Service channels
-
Realizar online
Para realizar este serviço precisa de se autenticar com um dos seguintes meios:
Procedure and requirements
Documentos and requirements
This information is currently being updated.
Procedure
This information is currently being updated.
How much
Legislation, refusals, contests, claims
Legislation
The requirements applicable to interim inspections are set out in Articles 19 and 20 of the Regulation on the installation and operation of simple pressure vessels and pressure equipment, annexed to Decree-Law No 131/2019.
Competent Entity
Instituto Português da Qualidade
Address: R. António Gião, 2 2829-513 Caparica
Phone number: + 351 21 294 81 00
Email address: ipq@ipq.pt
Web url: www.ipq.pt